Found 6 datasets matching filters.
-
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27