Found 10 datasets matching filters.
-
New school projects (Capacity) that will complete design within the next 6 months and will be available for bid.
Search relevance: 1.00 | Views last month: 2 | Published on: 2026-02-14 -
New school projects Capital Improvement Projects (CIP) that will complete design within the next 6 months and will be available for bid.
Search relevance: 1.00 | Views last month: 2 | Published on: 2026-02-14 -
MD drivers completing the MVA Driver Improvement Program. Data is based on completion certification posted to the drivers’ record.
Search relevance: 1.00 | Views last month: 1 | Published on: 2025-08-02 -
This data describes the Plan Check cases completed by DBS within 15 days the percentage of customers at DBS development services counters served within 30 minutes (wait time).
Search relevance: 1.00 | Views last month: 0 | Published on: 2025-08-02 -
NREL and the Colorado School of Mines (SURGE) conducted research in FY14 to identify petroleum drilling and completion practices (methods and technologies) that can be transferred to geothermal...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
The large scale Deep Direct Use (DDU) geothermal project in the low temperature environment of the Illinois Basin requires drilling and completing two wells. One well would be the extraction...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
Well completions are an integral part of providing safe, reliable and continuous access to underground resources such as oil, gas and geothermal resources. Completions are typically considered to...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
This paper discusses the progress on a project funded by the DOE Utah FORGE (Frontier Observatory for Research in Geothermal Energy) for the development of a subsurface heat exchanger for Enhanced...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
This preliminary data archive includes meteorological data recorded at the Utah FORGE facility over the period of time including the completion/cementing of well 16B(78)-32 and the initial 2023...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
Well lithology records in this layer come from the Department of Environmental Conservation's Water Supply Data Composite. Managed by the Water Resources Section in the Drinking Water and...
Search relevance: 1.00 | Views last month: 0 | Published on: 2025-08-08