Found 16 datasets matching filters.
-
This 2019 Federal Cybersecurity Research and Development Strategic Plan supersedes the 2016 Federal Cybersecurity Research and Development Strategic Plan. The Plan aims to coordinate and guide...
Search relevance: 1.00 | Views last month: 8 | Published on: 2025-08-02 -
This report documents the full lifecycle of the SeaRAY Autonomous Offshore Power System (AOPS) project, detailing the design, development, testing, deployment, and recovery of a novel low-power...
Search relevance: 1.00 | Views last month: 7 | Published on: 2026-01-27 -
The purpose of this mapping is to provide the relationship between NIST Cybersecurity Framework (CSF) v1.1 and the NERC Critical Infrastructure Protection (CIP) Standards.Target Audience:The...
Search relevance: 1.00 | Views last month: 6 | Published on: 2025-08-02 -
This dataset details how ICE continued to build off its FY 2023 accomplishments to mature its Enterprise Risk Management (ERM) program as required by OMB Circular No. A-123.
Search relevance: 1.00 | Views last month: 5 | Published on: 2025-09-15 -
Title of each data set starts with the section number of report, which the data were used in analysis. This dataset is associated with the following publication: Yang, J., H. Wei, X. Wang, S....
Search relevance: 1.00 | Views last month: 5 | Published on: 2025-08-02 -
The Failure Modes and Effects Analysis (FMEA) is a qualitative reliability technique for systematically analyzing each possible failure mode within a hardware system, and identifying the resulting...
Search relevance: 1.00 | Views last month: 4 | Published on: 2026-01-27 -
THIS DATASET IS OBSOLETE. PLEASE REFERENCE THE NEWER MAPPING IN OLIR (https://doi.org/10.18434/mds2-3215).The spreadsheets in this data set map National Institute of Standards and Technology...
Search relevance: 1.00 | Views last month: 2 | Published on: 2025-08-02 -
The Board uses the Senior Financial Officer Survey (FR 2023) to gather qualitative and limited quantitative information about liability management, the provision of financial services, and the...
Search relevance: 1.00 | Views last month: 1 | Published on: 2026-01-24 -
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
New Claims Per Month
Search relevance: 1.00 | Views last month: 0 | Published on: 2025-08-02 -
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-02-20 -
The goal of this study was to assist the Massachusetts Department of Social Services (DSS) with the risk management of youth (aged 4 to 20), identified through the Assessment for Safe...
Search relevance: 1.00 | Views last month: 0 | Published on: 2025-11-14 -
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-01-27 -
Benefits Expenditures
Search relevance: 1.00 | Views last month: 0 | Published on: 2025-08-02 -
We measured polychlorinated biphenyl (PCB) concentrations in two taxa of riparian spiders from nine sites in 2011 at the Ashtabula River Area of Concern. We analyzed the extracts for 122 congeners...
Search relevance: 1.00 | Views last month: 0 | Published on: 2026-03-03