Skip to main content
U.S. flag

An official website of the United States government

This site is currently in beta, and your feedback is helping shape its ongoing development.

ASTER Expedited L1A Reconstructed Unprocessed Instrument Data V003

Published by LP DAAC;JP/METI/AIST/JSS/GDS | National Aeronautics and Space Administration | Metadata Last Checked: January 03, 2026 | Last Modified: 2025-12-30
The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) Expedited Level 1A Reconstructed Unprocessed Instrument Data (AST_L1AE) global product contains reconstructed, unprocessed instrument digital data derived from the acquired telemetry streams of the telescopes: Visible and Near Infrared (VNIR), Shortwave Infrared (SWIR), and Thermal Infrared (TIR). This data product is similar to the ([AST_L1A](http://doi.org/10.5067/ASTER/AST_L1A.003)) with a few notable exceptions. These include:* The AST_L1AE is available for download within 48 hours of acquisition in support of field calibration and validation efforts, in addition to emergency response for natural disasters where the quick turn-around time from acquisition to availability would prove beneficial in initial damage or impact assessments.* The registration quality of the AST_L1AE is likely to be lower than the AST_L1A, and may vary from scene to scene.* The AST_L1AE data product does not contain the VNIR 3B (aft-viewing) Band.* This dataset does not have short-term calibration for the Thermal Infrared (TIR) sensor.* The AST_L1AE data product is only available for download 30 days after acquisition. It is then removed and reprocessed into an AST_L1A product.Known Issues* Users are advised that ASTER SWIR data acquired from April 2008 to the present exhibit anomalous saturation of values and anomalous striping. This effect is also present for some prior acquisition periods. Please refer to the ASTER SWIR User Advisory for more details.* Data acquisition gaps: On November 28, 2024, one of Terra's power-transmitting shunt units failed. As a result, there was insufficient power to maintain functionality of the ASTER instrument. ASTER resumed acquisitions for the VNIR bands on January 18, 2025, and for the TIR bands on April 15, 2025. Users should note the data gap in ASTER acquisitions from November 28, 2024, through January 16, 2025, for VNIR observations, and a gap from November 28, 2024, through April 15, 2025, for TIR acquisitions.

Complete Metadata

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov