Return to search results
Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| bureauCode |
[
"019:20"
]
|
| contactPoint |
{
"fn": "Ean Amon",
"@type": "vcard:Contact",
"hasEmail": "mailto:amon@columbiapwr.com"
}
|
| dataQuality |
true
|
| description | Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here. |
| distribution |
[
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0100%20Hull%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - PTO.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0200%20PTO%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Power Take-Off (PTO) Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD 07-20-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electric Plant.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0300%20Electric%20Plant%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electric Plant Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - SCADA.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0400%20SCADA%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "SCADA Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Emergency Systems.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0520%20Emergency%20Systems%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Emergency Systems Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Climate Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0530%20Climate%20Control%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Climate Control Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Station Power.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0540%20Station%20Power%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Station Power Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Auxiliary Power.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0545%20Auxiliary%20Power%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Auxiliary Power Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Aids to Navigation.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0550%20Aids%20to%20Nav%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Aids to Navigation Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Cooling System.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0560%20Cooling%20System%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Cooling System Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Surveillance.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0580%20Surveillance%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Surveillance Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Designations and Markings.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0610%20Designation%20and%20Markings%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Designations and Markings Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Fitting.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0620%20Hull%20Fitting%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Fitting Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Penetrations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0630%20Hull%20Penetrations%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Penetrations Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Mooring.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0700%20Mooring%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Mooring Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Umbilical.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0007627%20D1.2%20LP-RR-0800%20Umbilical%20PD%2007-20-2019.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Umbilical Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf]"
},
{
"@type": "dcat:Distribution",
"title": "Risk Management Plan.pdf",
"format": "pdf",
"accessURL": "https://mhkdr.openei.org/files/312/DE-EE0008627%20D1.2%20Risk%20Management%20Plan%20PD%20v1.1%2007-19-2019.pdf",
"mediaType": "application/pdf",
"description": "Risk Management Plan"
}
]
|
| DOI | 10.15473/1557617 |
| identifier | https://data.openei.org/submissions/7969 |
| issued | 2019-07-19T06:00:00Z |
| keyword |
[
"Columbia Power Technologies",
"Cost Reduction",
"Effects",
"FMECA",
"Low-Power WEC",
"MHK",
"Maintenance",
"Marine",
"Non-Grid Applications",
"Operation",
"PTO",
"Power Take-Off",
"Renewables",
"Risk Management",
"Risk Register",
"WEC",
"Wave",
"Wave energy",
"criticality analysis",
"environment",
"failure modes",
"low-power wave energy converter",
"risk",
"wave energy converter"
]
|
| landingPage | https://mhkdr.openei.org/submissions/312 |
| license | https://creativecommons.org/licenses/by/4.0/ |
| modified | 2024-07-18T06:00:01Z |
| programCode |
[
"019:009"
]
|
| projectLead | Yana Shininger |
| projectNumber | EE0008627 |
| projectTitle | MARINE ENERGY SYSTEM DESIGN AND VALIDATION |
| publisher |
{
"name": "Columbia Power Technologies, Inc.",
"@type": "org:Organization"
}
|
| spatial |
"{"type":"Polygon","coordinates":[[[-123.27001333237,44.51097499112],[-123.27001333237,44.51097499112],[-123.27001333237,44.51097499112],[-123.27001333237,44.51097499112],[-123.27001333237,44.51097499112]]]}"
|
| title | Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications |