Skip to main content
U.S. flag

An official website of the United States government

This site is currently in beta, and your feedback is helping shape its ongoing development.

Round 1 Solicitation Electric Fuel Corridor Groups (updated December 2023)

Published by California Energy Commission | State of California | Metadata Last Checked: July 28, 2025 | Last Modified: 2023-12-19T23:42:48.616Z
This layer includes the groups for Round 1 of California's NEVI Funding Program.Data Dictionary:Corridor Segment - A portion of a highway corridor.Corridor Group - A group of one or more corridor segments.  Alternative Fuel Corridor - The U.S. Department of Transportation Federal Highway Administration (FHWA) designates a national network of plug-in electric vehicle (EV) charging and hydrogen, propane, and natural gas fueling infrastructure along national highway system corridors. To designate these Alternative Fuel Corridors (AFC), FHWA solicits nominations from state and local officials and works with other federal officials and industry stakeholders.Minimum Sites - The minimum number of project sites a corridor segment must have to be eligible for NEVI funding through California’s NEVI program solicitations. Chargers Required - The minimum number of new chargers a corridor segment must have to be eligible for NEVI funding through California’s NEVI program solicitations.Required Sites - Sites required along a corridor segment, if applicable. Additional Note - Additional notes as written in the Solicitation Manual, if applicable.

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov