Solar Permitting, Inspection, and Interconnection Cycletimes and Requirements

Published by National Renewable Energy Laboratory | Department of Energy | Metadata Last Checked: January 27, 2026 | Last Modified: 2025-11-20T15:52:45Z
Twenty three small-to-large residential, commercial, and industrial PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (SolarTRACE) viewer. This dataset has been reviewed but errors may exist, and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov