S&T Project 22024 Interim Report: Learning from the Past, Inspection of Historic Penstock Lining Field Trials; Shasta Penstocks and Collbran Siphon
Corrosion protection is fundamental to achieve infrastructure longevity. Coatings are the primary defense against corrosion. The Bureau of Reclamation began a field study in 1949 at Shasta Dam Unit 5 Penstock. Originally 26 different linings were installed in the field trial, seventy years later a detailed inspection was conducted in 2019, seven linings were still providing corrosion protection. Additionally in 2009, spot repairs were conducted due to failed coal tar enamel using a 100% solids epoxy and was in excellent condition after 10 years of service. Each lining was evaluated using Electrochemical Impedance Spectroscopy (EIS) to determine the barrier properties.
Complete Metadata
| accessLevel | public |
|---|---|
| accrualPeriodicity | irregular |
| bureauCode |
[
"010:10"
]
|
| contactPoint |
{
"fn": "RISE Team",
"@type": "vcard:Contact",
"hasEmail": "mailto:data@usbr.gov"
}
|
| description | Corrosion protection is fundamental to achieve infrastructure longevity. Coatings are the primary defense against corrosion. The Bureau of Reclamation began a field study in 1949 at Shasta Dam Unit 5 Penstock. Originally 26 different linings were installed in the field trial, seventy years later a detailed inspection was conducted in 2019, seven linings were still providing corrosion protection. Additionally in 2009, spot repairs were conducted due to failed coal tar enamel using a 100% solids epoxy and was in excellent condition after 10 years of service. Each lining was evaluated using Electrochemical Impedance Spectroscopy (EIS) to determine the barrier properties. |
| distribution |
[
{
"@type": "dcat:Distribution",
"title": "RISE Item Details Page URL for "S&T Project 22024 Interim Report: Learning from the Past, Inspection of Historic Penstock Lining Field Trials; Shasta Penstocks and Collbran Siphon"",
"accessURL": "https://data.usbr.gov/catalog/7990/item/128547",
"mediaType": "text/html",
"description": "Landing page for "S&T Project 22024 Interim Report: Learning from the Past, Inspection of Historic Penstock Lining Field Trials; Shasta Penstocks and Collbran Siphon""
},
{
"@type": "dcat:Distribution",
"title": "PDF File for "S&T Project 22024 Interim Report: Learning from the Past, Inspection of Historic Penstock Lining Field Trials; Shasta Penstocks and Collbran Siphon"",
"mediaType": "application/pdf",
"description": ""S&T Project 22024 Interim Report: Learning from the Past, Inspection of Historic Penstock Lining Field Trials; Shasta Penstocks and Collbran Siphon" as a PDF file",
"downloadURL": "https://data.usbr.gov/rise/content-rise-public/rise/catalog-item/binary/8540-2023-42_Shasta_Unit5_Inspection_Report_Final_508.pdf"
}
]
|
| identifier | https://datainventory.usbr.gov/rise/item/128547 |
| keyword |
[
"Collbran Project",
"Corrosion Protection",
"Equivalent Circuit Model (ECM)",
"Field Electrochemical Impedance Spectroscopy (EIS) Testing",
"Historic Linings",
"Salt Creek Siphon",
"Shasta Dam"
]
|
| landingPage | https://data.usbr.gov/catalog/7990/item/128547 |
| modified | 2023-11-14T22:46:38Z |
| publisher |
{
"name": "Bureau of Reclamation",
"@type": "org:Organization"
}
|
| spatial |
"{"type":"Polygon","coordinates":[[[-124.508,48.197],[-124.304,40.096],[-117.02,32.608],[-103.405,29.136],[-93.466,30.77],[-94.692,38.939],[-97.279,48.946],[-122.67,48.946],[-124.508,48.197]]]}"
|
| title | S&T Project 22024 Interim Report: Learning from the Past, Inspection of Historic Penstock Lining Field Trials; Shasta Penstocks and Collbran Siphon |