StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Resources
18 resources available
-
Risk Register - Hull.xlsx
XLSX -
Risk Register - PTO.xlsx
XLSX -
Risk Register - Electric Plant.xlsx
XLSX -
Risk Register - SCADA.xlsx
XLSX -
Risk Register - Ballast Control.xlsx
XLSX -
Risk Register - Safety.xlsx
XLSX -
Risk Register - Climate Control.xlsx
XLSX -
Risk Register - Station Power.xlsx
XLSX -
Risk Register - Cooling System.xlsx
XLSX -
Risk Register - Bilge.xlsx
XLSX -
Risk Register - Surveillance.xlsx
XLSX -
Risk Register - Outfit Furnishings.xlsx
XLSX -
Risk Register - Hull Fitting.xlsx
XLSX -
Risk Register - Hull Penetrations.xlsx
XLSX -
Risk Register - Marinization Corrosion.xlsx
XLSX -
Risk Register - Mooring.xlsx
XLSX -
Risk Register - Electrical Collection.xlsx
XLSX -
DOE Risk Management Framework.pdf
PDF
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| bureauCode |
[
"019:20"
]
|
| contactPoint |
{
"fn": "Ken Rhinefrank",
"@type": "vcard:Contact",
"hasEmail": "mailto:krhinefrank@columbiapwr.com"
}
|
| dataQuality |
true
|
| description | Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficiently. The FMECA can begin once there is enough detail to functions and failure modes of a given system, and its interfaces with other systems. The FMECA occurs coincidently with the design process and is an iterative process which allows for design changes to overcome deficiencies in the analysis. Risk Registers for major subsystems were completed in compliance with the DOE Risk Management Framework developed by NREL (document included below). |
| distribution |
[
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0100%20Hull%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - PTO.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0200%20PTO%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "PTO Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electric Plant.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0300%20Electric%20Plant%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electric Plant Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - SCADA.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0400%20SCADA%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "SCADA Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Ballast Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0510%20Ballast%20Control%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Ballast Control Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Safety.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0520%20Safety%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Safety Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Climate Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0530%20Climate%20Control%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Climate Control Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Station Power.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0540%20Station%20Power%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Station Power Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Cooling System.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0560%20Cooling%20System%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Cooling System Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Bilge.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0570%20Bilge%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Bilge Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Surveillance.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0580%20Surveillance%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Surveillance Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Outfit Furnishings.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0600%20Outfit%20and%20Furnishings%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Outfit & Furnishings Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Fitting.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0620%20Hull%20Fitting%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Fitting Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Penetrations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0630%20Hull%20Penetrations%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Penetrations Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Marinization Corrosion.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0640%20Marinization%20and%20Corrosion%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Marinization & Corrosion Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Mooring.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0700%20Mooring%20PD%20v3.0%2007-25-2016.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Mooring Risk Register completed according to the methodology described in Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf, in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electrical Collection.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/192/DE-EE0007347%20M3.4%20SR-RR-0800%20Electrical%20Collection%20PD%20v3.1%2002-17-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Risk Register - Electrical Collection"
},
{
"@type": "dcat:Distribution",
"title": "DOE Risk Management Framework.pdf",
"format": "pdf",
"accessURL": "https://mhkdr.openei.org/files/192/DOEriskManagementFramework.pdf",
"mediaType": "application/pdf",
"description": "Document developed by NREL detailing the Marine and Hydrokinetic Technology Development Risk Management Framework."
}
]
|
| DOI | 10.15473/1415597 |
| identifier | https://data.openei.org/submissions/7876 |
| issued | 2016-07-25T06:00:00Z |
| keyword |
[
"FMECA",
"Hawaii",
"Hydrokinetic",
"MHK",
"Marine",
"Renewable",
"Risk Register",
"WEC",
"Wave Energy Converter",
"absorber",
"analysis",
"cpwr",
"criticality",
"design",
"development",
"energy",
"failure mode",
"hull",
"mooring",
"point",
"point absorber buoy",
"power take off",
"process",
"pto",
"risk reduction",
"scada",
"stingray",
"supervisory control and data acquisition",
"technology",
"wave"
]
|
| landingPage | https://mhkdr.openei.org/submissions/192 |
| license | https://creativecommons.org/licenses/by/4.0/ |
| modified | 2020-06-29T20:47:03Z |
| programCode |
[
"019:009"
]
|
| projectLead | Alison LaBonte |
| projectNumber | EE0007347 |
| projectTitle | Reduction of System Cost Characteristics Through Innovative Solutions to Installation, Operations, and Maintenance |
| publisher |
{
"name": "Columbia Power Technologies, Inc.",
"@type": "org:Organization"
}
|
| spatial |
"{"type":"Polygon","coordinates":[[[-180,-83],[180,-83],[180,83],[-180,83],[-180,-83]]]}"
|
| title | StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers |