Return to search results
StingRAY Updated WEC Risk Registers
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| bureauCode |
[
"019:20"
]
|
| contactPoint |
{
"fn": "Ken Rhinefrank",
"@type": "vcard:Contact",
"hasEmail": "mailto:krhinefrank@columbiapwr.com"
}
|
| dataQuality |
true
|
| description | Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL. |
| distribution |
[
{
"@type": "dcat:Distribution",
"title": "Risk Register - PTO.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0200%20PTO%20PD%20v4.0%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "PTO Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electric Plant.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0300%20Electric%20Plant%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electric Plant Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0400%20SCADA%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Ballast Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0510%20Ballast%20Control%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Ballast Control Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Safety.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0520%20Safety%20PD%20v3.7%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Safety Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Climate Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0530%20Climate%20Control%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Climate Control Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Station Power.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0540%20Station%20Power%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Station Power Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Cooling System.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0560%20Cooling%20System%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Cooling System Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Bilge.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0570%20Bilge%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Bilge Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Surveillance.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0580%20Surveillance%20PD%20v3.0%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Surveillance Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Outfit Furnishings.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0600%20Outfit%20and%20Furnishings%20PD%20v3.0%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Outfit & Furnishings Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Fitting.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0620%20Hull%20Fitting%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Fitting Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Penetrations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0630%20Hull%20Penetrations%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Penetrations Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Mooring.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0700%20Mooring%20PD%20v3.7%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Mooring Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electrical Collection.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0800%20Electrical%20Collection%20PD%20v3.7%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electrical Collection Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Operations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-1100%20Operations%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Operations Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "DOE Risk Management Framework",
"format": "HTML",
"accessURL": "https://mhkdr.openei.org/submissions/192",
"mediaType": "text/html",
"description": "Document developed by NREL detailing the Marine and Hydrokinetic Technology Development Risk Management Framework."
}
]
|
| DOI | 10.15473/1513769 |
| identifier | https://data.openei.org/submissions/7947 |
| issued | 2018-06-27T06:00:00Z |
| keyword |
[
"Columbia Power Technologies",
"Cost Reduction",
"FMECA",
"Hydrokinetic",
"Installation",
"MHK",
"Maintenance",
"Marine",
"Operation",
"PTO",
"Risk Register",
"StingRAY",
"WEC",
"absorber",
"attenuator",
"ballast",
"bilge",
"climate",
"control",
"converter",
"cooling",
"direct-drive",
"electric plant",
"electrical collection",
"energy",
"fitting",
"furnishing",
"hull",
"magnet generator",
"module",
"mooring",
"operations",
"outfit",
"penetrations",
"point",
"point absorber buoy",
"power",
"power-take-off",
"risk management",
"safety",
"single-point mooring",
"station power",
"surveillance",
"system",
"technology",
"wave",
"wave energy"
]
|
| landingPage | https://mhkdr.openei.org/submissions/283 |
| license | https://creativecommons.org/licenses/by/4.0/ |
| modified | 2024-05-16T22:30:01Z |
| programCode |
[
"019:009"
]
|
| projectLead | Tim Ramsey |
| projectNumber | EE0007347 |
| projectTitle | REDUCTION OF SYSTEM COST CHARACTERISTICS THROUGH INNOVATIVE SOLUTIONS TO INSTALLATION, OPERATIONS, AND MAINTENANCE |
| publisher |
{
"name": "Columbia Power Technologies, Inc.",
"@type": "org:Organization"
}
|
| spatial |
"{"type":"Polygon","coordinates":[[[-161.8820359375,18.250484639908],[-66.5318,18.250484639908],[-66.5318,49.2637],[-161.8820359375,49.2637],[-161.8820359375,18.250484639908]]]}"
|
| title | StingRAY Updated WEC Risk Registers |