StingRAY WEC Risk Register
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL.
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| bureauCode |
[
"019:20"
]
|
| contactPoint |
{
"fn": "Ken Rhinefrank",
"@type": "vcard:Contact",
"hasEmail": "mailto:krhinefrank@columbiapwr.com"
}
|
| dataQuality |
true
|
| description | Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL. |
| distribution |
[
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0100%20Hull%20PD%20v3.5%2002-24-2017%20%282%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - PTO.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0200%20PTO%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "PTO Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electric Plant.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0300%20Electric%20Plant%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electric Plant Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - SCADA.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0400%20SCADA%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "SCADA Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Ballast Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0510%20Ballast%20Control%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Ballast Control Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Safety.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0520%20Safety%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Safety Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Climate Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0530%20Climate%20Control%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Climate Control Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Station Power.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0540%20Station%20Power%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Station Power Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Cooling System.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0560%20Cooling%20System%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Cooling System Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Bilge.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0570%20Bilge%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Bilge Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Fitting.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0620%20Hull%20Fitting%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Fitting Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Penetrations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0630%20Hull%20Penetrations%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Penetrations Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Marinization and Corrosion.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0640%20Marinization%20and%20Corrosion%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Marinization & Corrosion Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL"
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Mooring.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0700%20Mooring%20PD%20v3.5%2003-03-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Mooring Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electrical Collection.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-0800%20Electrical%20Collection%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electrical Collection Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Operations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/208/DE-EE0007347%20M7.4%20SR-RR-1100%20Operations%20PD%20v3.5%2002-24-2017.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Operations Risk Register completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "DOE Risk Management Framework",
"format": "HTML",
"accessURL": "https://mhkdr.openei.org/submissions/192",
"mediaType": "text/html",
"description": "Document developed by NREL detailing the Marine and Hydrokinetic Technology Development Risk Management Framework."
},
{
"@type": "dcat:Distribution",
"title": "Project Peer Review Presentation",
"format": "pdf",
"accessURL": "https://www.energy.gov/sites/prod/files/2017/03/f34/reduction-system-cost-characteristics-through-innovative-solutions.pdf",
"mediaType": "application/pdf",
"description": "Peer review presentation associated with this project titled "Reduction of System Cost Characteristics through Innovative Solutions to Installation, Operations, and Maintenance.""
}
]
|
| DOI | 10.15473/1496643 |
| identifier | https://data.openei.org/submissions/7890 |
| issued | 2017-02-24T07:00:00Z |
| keyword |
[
"Hawaii",
"Hydrokinetic",
"MHK",
"Marine",
"PTO",
"Risk Register",
"SCADA",
"USA",
"WEC",
"absorber",
"assessment",
"assets",
"ballast control",
"component",
"cwpr",
"electric plant",
"energy",
"environment",
"failure",
"hull structure",
"impact",
"management",
"mitigation",
"operation",
"point",
"point absorber buoy",
"power",
"power take off",
"renewable energy",
"risk",
"safety",
"severity",
"stingray",
"supervisory control and data acquisition",
"wave",
"wave energy converter"
]
|
| landingPage | https://mhkdr.openei.org/submissions/208 |
| license | https://creativecommons.org/licenses/by/4.0/ |
| modified | 2024-05-16T22:15:02Z |
| programCode |
[
"019:009"
]
|
| projectLead | Alison LaBonte |
| projectNumber | EE0007347 |
| projectTitle | REDUCTION OF SYSTEM COST CHARACTERISTICS THROUGH INNOVATIVE SOLUTIONS TO INSTALLATION, OPERATIONS, AND MAINTENANCE |
| publisher |
{
"name": "Columbia Power Technologies, Inc.",
"@type": "org:Organization"
}
|
| spatial |
"{"type":"Polygon","coordinates":[[[-162.1017625,18.33393398122],[-66.5318,18.33393398122],[-66.5318,49.2637],[-162.1017625,49.2637],[-162.1017625,18.33393398122]]]}"
|
| title | StingRAY WEC Risk Register |