Skip to main content
U.S. flag

An official website of the United States government

This site is currently in beta, and your feedback is helping shape its ongoing development.

Return to search results

Triton-C WEC Installation, Operations and Maintenance Plan (DDP)

Published by Oscilla Power, Inc. | Department of Energy | Metadata Last Checked: January 27, 2026 | Last Modified: 2025-11-03T07:00:06Z
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement. This document details the IO&M and safety procedures for each system and subsystem in the Triton-C WEC.

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov