StingRAY Updated WEC Risk Registers
Resources
17 resources available
-
Risk Register - PTO.xlsx
XLSX -
Risk Register - Electric Plant.xlsx
XLSX -
Risk Register - Hull.xlsx
XLSX -
Risk Register - Ballast Control.xlsx
XLSX -
Risk Register - Safety.xlsx
XLSX -
Risk Register - Climate Control.xlsx
XLSX -
Risk Register - Station Power.xlsx
XLSX -
Risk Register - Cooling System.xlsx
XLSX -
Risk Register - Bilge.xlsx
XLSX -
Risk Register - Surveillance.xlsx
XLSX -
Risk Register - Outfit Furnishings.xlsx
XLSX -
Risk Register - Hull Fitting.xlsx
XLSX -
Risk Register - Hull Penetrations.xlsx
XLSX -
Risk Register - Mooring.xlsx
XLSX -
Risk Register - Electrical Collection.xlsx
XLSX -
Risk Register - Operations.xlsx
XLSX -
DOE Risk Management Framework
HTML
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| bureauCode |
[
"019:20"
]
|
| contactPoint |
{
"fn": "Ken Rhinefrank",
"@type": "vcard:Contact",
"hasEmail": "mailto:krhinefrank@columbiapwr.com"
}
|
| dataQuality |
true
|
| description | Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL. |
| distribution |
[
{
"@type": "dcat:Distribution",
"title": "Risk Register - PTO.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0200%20PTO%20PD%20v4.0%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "PTO Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electric Plant.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0300%20Electric%20Plant%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electric Plant Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0400%20SCADA%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Ballast Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0510%20Ballast%20Control%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Ballast Control Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Safety.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0520%20Safety%20PD%20v3.7%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Safety Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Climate Control.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0530%20Climate%20Control%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Climate Control Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Station Power.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0540%20Station%20Power%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Station Power Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Cooling System.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0560%20Cooling%20System%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Cooling System Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Bilge.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0570%20Bilge%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Bilge Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Surveillance.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0580%20Surveillance%20PD%20v3.0%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Surveillance Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Outfit Furnishings.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0600%20Outfit%20and%20Furnishings%20PD%20v3.0%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Outfit & Furnishings Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Fitting.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0620%20Hull%20Fitting%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Fitting Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Hull Penetrations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0630%20Hull%20Penetrations%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Hull Penetrations Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Mooring.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0700%20Mooring%20PD%20v3.7%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Mooring Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Electrical Collection.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0800%20Electrical%20Collection%20PD%20v3.7%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Electrical Collection Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "Risk Register - Operations.xlsx",
"format": "xlsx",
"accessURL": "https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-1100%20Operations%20PD%20v3.6%2006-27-2018%20%281%29.xlsx",
"mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
"description": "Operations Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL."
},
{
"@type": "dcat:Distribution",
"title": "DOE Risk Management Framework",
"format": "HTML",
"accessURL": "https://mhkdr.openei.org/submissions/192",
"mediaType": "text/html",
"description": "Document developed by NREL detailing the Marine and Hydrokinetic Technology Development Risk Management Framework."
}
]
|
| DOI | 10.15473/1513769 |
| identifier | https://data.openei.org/submissions/7947 |
| issued | 2018-06-27T06:00:00Z |
| keyword |
[
"Columbia Power Technologies",
"Cost Reduction",
"FMECA",
"Hydrokinetic",
"Installation",
"MHK",
"Maintenance",
"Marine",
"Operation",
"PTO",
"Risk Register",
"StingRAY",
"WEC",
"absorber",
"attenuator",
"ballast",
"bilge",
"climate",
"control",
"converter",
"cooling",
"direct-drive",
"electric plant",
"electrical collection",
"energy",
"fitting",
"furnishing",
"hull",
"magnet generator",
"module",
"mooring",
"operations",
"outfit",
"penetrations",
"point",
"point absorber buoy",
"power",
"power-take-off",
"risk management",
"safety",
"single-point mooring",
"station power",
"surveillance",
"system",
"technology",
"wave",
"wave energy"
]
|
| landingPage | https://mhkdr.openei.org/submissions/283 |
| license | https://creativecommons.org/licenses/by/4.0/ |
| modified | 2024-05-16T22:30:01Z |
| programCode |
[
"019:009"
]
|
| projectLead | Tim Ramsey |
| projectNumber | EE0007347 |
| projectTitle | REDUCTION OF SYSTEM COST CHARACTERISTICS THROUGH INNOVATIVE SOLUTIONS TO INSTALLATION, OPERATIONS, AND MAINTENANCE |
| publisher |
{
"name": "Columbia Power Technologies, Inc.",
"@type": "org:Organization"
}
|
| spatial |
"{"type":"Polygon","coordinates":[[[-161.8820359375,18.250484639908],[-66.5318,18.250484639908],[-66.5318,49.2637],[-161.8820359375,49.2637],[-161.8820359375,18.250484639908]]]}"
|
| title | StingRAY Updated WEC Risk Registers |